|
|
 |

Shiraz Metro Lines |
| |
First
line route: |
The length of the Line No. One in Shiraz metro network will be 24.2 Km which will connect Gol_e_Sorkh Sq. to Ehsan Sq. through Vali Asr Sq., Namazi Sq. Ghasr Dasht Sq., Golkhoon St. and Mirza shirazi Sq. |
|
The main depot (Workshop and Parking) is located about 1,300 meter south east of Gol_e_Sorkh Sq. and depot no.2 will be near Ehsan Sq.
First line has 21 underground stations and . This line passes through municipality territories and real estates (streets, side walks and…)
At the first 15 Km from the beginning of this line,has two separate tunnels with the diameter of 7m that will be constructed and from Zargari and, Ghasr Dasht St., Ghasr Dasht Sq., Golkhoon St. to Chamran bridge just 1 tunnel with cut and cover method will be constructed. |
From Chamran Bridge to Mirza shirazi Sq., the line is at grade
Beside Dry River and from Mirza shirazi Sq. up to Ehsan Sq.
Main depot and workshop is about 27 hectares which is designed for wagons parking, dispatching, washing, cleaning and repairing about 120 wagons.
Depot No.2 will be about 15 km underground and will be designed and constructed for the 18 wagons stops. The area of this depot is 20000 sq meter.
|
| |
Second
line route: |
The length of this line will be 8.5 Km, which will connect Imam Hossein Sq. to Mian Rood & Adel Abaad through Enghelab Street and Basij Sq.
Structural specifications of this line will be 15m underground with 2 separated tunnels with about 7 meters diameter.
Coordination & conformity of technical specifications of this line with the first line, construction of 1 station (Depot No. 3) at the end of this line (in Mian Rood) and all activities such as washing, cleaning, repairing which are done at main Depot is another specification of this line.
This line and its transportation are not completely independent from the first line.
There will be 8 underground stations and 2 stations at grade ground in this line.
|
|
| |
Third
line route: |
The length of the third line is 16 km which will connect Mirza Koochak Khan Sq. to the golestan , shahid Beheshty, Hafez, Bezin and Esteghlal Towns, Golestan town crossroad.
About 4 km of the beginning of this line will be built in a form of a cut and cover tunnels and the rest of the route will be at grade. In this line there will be 6 of the both, underground and at grade, stations up to Golestan Town crossroad . In view of the fact that The State Railroad Company (Esfahan – Shiraz) is now constructing a railroad terminal close to Golestan Town and about one km from the Golestan Town crossroad, therefore for transportation of the passengers who will arrive in or depart from this railroad terminal, a special metro station is foreseen in the third metro line which will be built around this railroad terminal.
Research and study about the construction of the third line has begun from the second half of Iranian year 1382 , and provided the necessary funds are received on time, hopefully the third line will be operational too, at the same time the first line is going to be operational.
|
| |
|
|
|
 |
 |
| Namazi Station |
| |
Shariyati Station |
|
|
|
|
|